Summary
Ameresco worked with Ontario’s Independent Electricity System Operator (IESO) to design and build two battery energy storage systems (BESS) on Newmarket – Tay Power Distribution Ltd’s distribution grid. Ameresco owns, operates, and maintains both facilities, with a total capacity of 4 MW / 16 MWh. This project provides critical timeshifting of energy consumption and production and demonstrates the value of ancillary services.
“Projects like Ameresco’s help advance our understanding of how energy storage can improve the reliability and cost-efficiency of Ontario’s electricity system. One of the ways these projects can provide value is by storing energy when prices are low and injecting it back into the grid during periods of greater need and higher prices.”
– Terry Young
Vice President, Policy, Engagement and Innovation, IESO
Energy Storage System Configuration
Energy Storage Facility Contact Term
Overall Energy Storage Capacity
Infrastructure Investment
Customer Benefits
The Ontario IESO is delivering ratepayer value and environmental benefits through Amereso’s Newmarket – Tay Power Distribution connected Battery Energy Storage System. By integrating the solid-state lithium-ion batteries for the 44 kV grid interconnected BESS, the facility is able to absorb power during periods of excess energy supply and provide it back to the grid when energy demand is high. In addition to providing this basic “energy balancing” function, these systems will also provide on-going grid reliability and stability as more renewable energy comes online in the area.
- Store electricity during off-peak times
- Deliver grid reliability and stability
- Utilize stored power during peak demand
- Provide ancillary services
- Allow participation in the IESO administered markets
Services Provided
The project began in 2015 when Ameresco secured two Energy Storage Facility Agreements from Ontario’s IESO to design, build, own, and operate two 2 MW, four-hour “Battery Solid” energy storage systems. These completed systems provide 16 MWh in overall energy storage capacity.
- Overall design of the BESS and project build
- Operations and maintenance
- Ameresco supplies energy capacity services to the IESO
Additional Project Highlights
Share this entry
Solutions
CASTLEFORD OFFICE
Wesley House, 5 Wesley Street
Castleford WF10 1JG
+44 (0) 1133 604 819
PRESS RELEASES
- Current ± – UK’s largest industrial zone Teesworks plans 1GW BESS
- The Northern Echo – Sonnedix begins building largest UK solar PV plant at Cowley Complex
- EV Wind – Sonnedix begins construction of its largest UK photovoltaic plant
- Power Online – Sonnedix Begins Construction Of Its Largest UK Solar PV Plant, Providing 100 Green Jobs To Local Area
CONTACT US
LONDON OFFICES
Ranger House, Walnut Tree Close
Guildford GU1 4UL
Halkin Building, 4th Floor
1-2 Paris Garden
Southwark
London SE1 8ND
+44 20 3542 8300
LEEDS OFFICE
Goodbard House, 1st Floor
15 Infirmary Street
West Yorkshire
Leeds LS1 2JS
+44 (0) 1133 604 819